portfolio

The BAT Medias portfolio includes numerous works that are being carried out or are ongoing, both locally and nationally. These include the replacement of pipelines, the upgrading, installation, and commissioning of gas compressing facilities and equipment, etc.

Works executed by BAT Medias SA

Works regarding the securing of the 16″ Buhoci – Valea Malului pipe

Read more

Dărmănești, România

10/10/2017

Setting up the Roman 283 probe for injection of sewage

Read more

Roman, România

10/10/2017

Deviation of the gas pipeline Dn 300 mm Moinesti – Darmanesti

Read more

Dărmănești, România

10/10/2017

Repairing of the Coroi – Paltin pipeline, line 2

Read more

Paltin, România

10/10/2017

Replacement of the 20″ Baraganu – RAFO Onesti oil pipeline

Read more

Onești, România

10/10/2017

Repairing of the 28″ pipeline, Coroi – Paltin, line 1

Read more

Paltin, România

10/10/2017

Specific works of DN 700 mm pipe, Band area

Read more

Band, România

10/10/2017

Upgrading the compression unit “Gas Compression Station Deleni”

Read more

Deleni, România

10/10/2017

Ongoing works

Natural gas pipeline Podisor – Recas, lot 1 – from km 0 to km 180

Read more

Recaș, România

10/10/2017

Modernization of the current cooling system for compressed gases and compressors from S.C. Taga

Read more

Popești Leordeni, România

10/10/2017

Wastewater injection system Prope Group 131 Prod – Seleus

Read more

Deleni, Romania

10/10/2017

Deviations and protection of natural gas pipelines for the objective Ogra – Campia Turzii, Lot 3

Read more

Deleni, Romania

10/10/2017

Gas collector Caragele-Galbenu

Read more

Deleni, Romania

10/10/2017