Deviations and protection of natural gas pipelines for the objective Ogra – Campia Turzii, Lot 3

Deviations and protection of natural gas pipelines for the objective: Design and execution for the Brasov – Targu Mures – Cluj – Oradea highway. Section 2A: Ogra – Campia Turzii, Lot 3 – beneficiary CNAIR Bucharest through Straco Group for the final beneficiary Transgaz.

  • user Created with Sketch Beta. Beneficiary: CNAIR București
  • Deleni, Romania
  • 10/10/2017